Design transfer
The point where a design becomes a repeatable build. Drawings and tolerances become work instructions, tooling and inspection checks an operator can follow.
When design transfer is the right step
After the design is verified and before the first production build. Design transfer turns the design history file into the records production builds from.

Production records from the design file
The drawings, specifications and test methods in the design history file become the device master record that production works from.

Tooling and fixtures
Moulds, jigs and fixtures specified and made, so that parts come out the same way every time.

Work instructions and pilot builds
Each assembly and inspection step written down, then tried in a pilot build before production relies on it.
What you bring, and what you get back
You bring
- The design history file, or what exists of it
- Released drawings, CAD and specifications
- The bill of materials and the suppliers you use today
- The risk file and the verification results
- If a record is missing, the review at the start lists it.
You get back
- A device master record that production can build from
- Tooling and fixtures for production
- Work instructions and inspection plans
- A list of the processes that need validation, with the plans
- Pilot build results: the problems found and how they were fixed
- A transfer record that checks each design output as fit for production
A design that works is not yet a design that can be made
A prototype often works because the people who designed it also built it. They know which part to adjust and which step matters. Production needs that knowledge written into drawings, tolerances, work instructions and inspection criteria. ISO 13485 asks that design outputs are checked as suitable for manufacturing before they become production specifications.
How a design transfer runs
Questions buyers ask
When should design transfer start?
Plan it during design, not after. Choices about materials, tolerances and joining methods decide how a part can be made. The transfer itself runs once the design is verified and stable.
What is the difference between the DHF and the DMR?
The design history file records how the design was developed and verified. The device master record holds what production needs: specifications, drawings, procedures, labelling and inspection criteria. Our article on design transfer explains more.
Which processes need validation?
Any process whose result cannot be fully checked afterwards, such as sealing or bonding. ISO 13485 asks that these processes are validated before they are used in production.
Can you transfer a design you did not develop?
Yes. The work starts with a review of the design file and a list of gaps. Gaps in verification or risk records are closed before transfer.
What comes after transfer?
Usually a pilot batch, built from the production records, to find problems before volume production.

Design and production in one team
Nine disciplines work in one team, with the design office, labs and audited assembly lines together in Navi Mumbai. The engineers who designed a part are on hand when it is transferred.
Devices we have worked on
We name the type of device, not the client. Client work stays confidential. See every device type.
- Pulsed lavage irrigation system for orthopaedic surgery
- Battery-powered bone drill with its docking station
Run under an ISO 13485:2016 quality system certified by TÜV SÜD, certificate 99 400 00046. What it covers.
Not quite you?
Standards this work is done against
- ISO 13485, 7.3.8Design and development transfer
- ISO 13485, 7.5.6Validation of processes
The list for a given device, and the edition of each, is set in its regulatory plan.
Where this sits
Also in Co-Manufacturing
Tools for this
Have a question about Design transfer?
Opens the contact form with this service named. Nothing is sent until you press send.